l

"*" indicates required fields

MM slash DD slash YYYY

Scenario Summary:

A team has rigged ropes with a pre-rigged system for lowering injured technicians to a safe area below. The plan has now changed. The ropes will now extend further down the building and pass an edge that was not present in the original configuration. The rescue plan may need revision.

1. What is the most immediate action that should be taken in response to the change in rope routing?
2. What key element has changed in the original rescue plan?
3. Which of the following is now a potential new hazard that must be addressed in the rescue plan?
4. What should be done to the original rescue plan before continuing the task?
5. If an edge protector is required due to the new rope route, who is responsible for ensuring it is installed?
6. What is the potential consequence of not updating the rescue plan after the change in rope configuration?
7. In terms of compliance, what document is likely to need revision due to the change?
8. If the original pre-rigged lowering system is no longer suitable due to the edge hazard, what type of alternative rescue method might now be required?
9. Will additional equipment be required to change the rescue plan?
10. What must be considered if a new intervention-based rescue plan replaces the original pre-rigged system?
MM slash DD slash YYYY
Clear Signature

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
0

Start typing and press Enter to search